J4

• 地质工程·环境工程 • 上一篇    下一篇

大庆西部地下水位降落漏斗区水资源人工调蓄方案

高淑琴1,2,苏小四1,2,杜新强1,谢轶1,2,齐素文3   

  1. 1.吉林大学 环境与资源学院/水资源与环境研究所,长春 130026;2.教育部城市环境与可持续发展联合研究中心 吉林大学分中心,长春 130026;3.大庆石油管理局 供水公司,黑龙江 大庆 163000
  • 收稿日期:2007-05-08 修回日期:1900-01-01 出版日期:2008-03-26 发布日期:2008-03-26
  • 通讯作者: 高淑琴

Artificial Regulation Groundwater Depression Cone in West of Daqing

GAO Shu-qin1,2, SU Xiao-si1,2, DU Xin-qiang1, XIE Yi1,2, QI Su-wen3   

  1. 1.College of Environment and Resources/Institute of Water Resources and Environment,Jilin University,Changchun 130026,China;2.Branch of Jilin University,Joint Research Center of Urban Environment and Sustainable Development, Ministry of Education, Changchun 130026, China;3.Water Supply Company,Daqing Petroleum Administration Bureau, Daqing,Heilongjiang 163000, China
  • Received:2007-05-08 Revised:1900-01-01 Online:2008-03-26 Published:2008-03-26
  • Contact: GAO Shu-qin

摘要: 对地下水资源的长期大量集中开采形成了区域性地下水位降落漏斗,地下水的超采引发了一系列环境地质问题。利用降落漏斗区腾空的地下储水空间进行水资源的人工调蓄可使地下水位得到恢复。以地下水为主要供水水源的大庆市目前已形成了东西两个大的区域性地下水位降落漏斗,必须进行地下水人工调蓄。设计并模拟了现状开采、逐年压缩分别在现采和压采基础之上进行人工回灌等4种人工调蓄方案,对大庆西部地下水位降落漏斗区进行水资源人工调蓄。结果表明,压缩开采和人工回灌均可加速降落漏斗区地下水位的恢复,在逐年压缩地下水开采量5%的情况下实施人工回灌(0.45×108m3/a),地下水位恢复效果最明显,到2010年末,漏斗中心地下水位可回升7.7~10.3 m。

关键词: 降落漏斗, 人工调蓄, 人工回灌, 大庆西部

Abstract: Large quantity of continuously groundwater pumping in an area forms regional groundwater depression cone, and overexploitation leads to a series of environmental and geological problems. Groundwater level can be recovered by artificial regulation of water resource in the empty underground space of the depression cone. Artificial regulation in groundwater depression cone is significant to Daqing, where groundwater is the main water supply resource. The authors designed and simulated four artificial regulation projects in the depression cone zone in west of Daqing, which are current pumping, reduced pumping, and artificial recharge based on current and reduced pumping. The result indicates that reducing the exploitation quantity and using artificial recharge methods can accelerate the recovery of depression cone. When reducing the quantity of groundwater pumping by 5% every year and executing artificial recharge(0.45×108m3/a), the recovery effect of groundwater level is more obvious than other projects, and groundwater level of the centre of depression cone will be recovered by 7.7-10.3 m up to the end of 2010.

Key words: depression cone, artificial regulation, artificial recharge, west of Daqing

中图分类号: 

  • P641
[1] 黄星, 路莹, 刘肖, 段晓飞, 朱利民. 地下水位抬升对人工回灌中悬浮物堵塞的影响[J]. 吉林大学学报(地球科学版), 2017, 47(6): 1810-1818.
[2] 苏小四, 孟祥菲, 张文静, 石旭飞, 何海洋. 人工回灌过程中地下水微生物群落变化[J]. 吉林大学学报(地球科学版), 2015, 45(2): 573-583.
[3] 黄修东,束龙仓,崔峻岭,童坤,周庆鹏. 人工回灌物理堵塞特征试验及渗滤经验公式推导[J]. 吉林大学学报(地球科学版), 2014, 44(6): 1966-1972.
[4] 石旭飞,张文静,王寒梅,焦珣,何海洋. 人工回灌过程中的水-岩相互作用模拟[J]. 吉林大学学报(地球科学版), 2013, 43(1): 220-227.
[5] 林学钰, 张文静, 何海洋, 石旭飞, 王寒梅, 焦珣. 人工回灌对地下水水质影响的室内模拟实验[J]. J4, 2012, 42(5): 1404-1409.
[6] 苏小四, 谷小溪, 孟婧莹, 张文静, 王寒梅, 焦珣. 人工回灌条件下多组分溶质的反应迁移模拟[J]. J4, 2012, 42(2): 485-491.
[7] 路莹, 杜新强, 迟宝明, 杨悦锁, 李胜涛, 王子佳. 地下水人工回灌过程中多孔介质悬浮物堵塞实验[J]. J4, 2011, 41(2): 448-454.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!