吉林大学学报(地球科学版) ›› 2018, Vol. 48 ›› Issue (6): 1778-1784.doi: 10.13278/j.cnki.jjuese.20170105
• 地质工程与环境工程 • 上一篇
李雨浓1, Lehane B M2
Li Yunong1, Lehane B M2
摘要: 为了揭示黏土中静压沉桩的宏观力学特性,采用西澳大学的梁式离心机压桩系统,通过在双层高岭黏土中进行一系列1g重力场情况下的T-bar触探测试试验、静压沉桩试验、桩拉伸试验和压缩试验,对比分析了T-bar分别在均质软质黏土和双层黏土中随贯入深度变化测得的不排水剪切强度的特性;研究了桩体在贯入过程中沉桩阻力、桩端阻力以及桩侧摩阻力的发展规律;并对桩身径向总应力在沉桩过程中的变化规律进行了探讨;此外,还揭示了不同桩型沉桩终压力与桩承载力之间的关系。结果表明:在黏土中沉桩时,桩侧摩阻力在整个沉桩阻力中发挥主要的作用;对于同一土层而言,当桩超过土层分界面以下2D(D为桩径)范围后,桩端阻力并不受相邻土层性质的影响;随着压桩后时间的推移,桩侧摩阻力对承载力的时效影响较桩端阻力大。
中图分类号:
[1] Lehane B M, Gavin K G. Base Resistance of Jacked Pipe Piles in Sand[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2001, 127(6):473-480. [2] 丁佩民, 肖志斌, 施健勇, 等. 松砂中大型静压沉桩模型试验桩基挤土加密效应[J].工业建筑, 2003, 33(3):45-48. Ding Peimin, Xiao Zhibin, Shi Jianyong, et al. Model Tests of Large Driven Pile Jacked into Sands and Soil-Pile Interaction Finite Element Analysis with Compaction Effect Taken into Account[J].Industrial Construction,2003,33(3):45-48. [3] 周健, 邓益兵, 叶建忠, 等. 砂土中静压桩沉桩过程试验研究与颗粒流模拟[J].岩土工程学报, 2009, 31(4):501-507. Zhou Jian, Deng Yibing, Ye Jianzhong, et al. Experimental and Numerical Analysis of Jacked Piles During Installation in Sand[J].Chinese Journal of Geotechnical Engineering, 2009, 31(4):501-507. [4] Nicola A D, Randolph M F. Centrifuge Modelling of Pipe Piles in Sand Under Axial Loads[J]. Geotechnique, 1999, 49(3):295-318. [5] Lehane B M, White D J. Lateral Stress Changes and Shaft Friction for Model Displacement Piles in Sand[J]. Canadian Geotechnical Journal, 2005, 42(4):1039-1052. [6] 刘清秉, 项伟, Lehane B M, 等. 颗粒形状对砂土抗剪强度及桩端阻力影响机制试验研究[J].岩石力学与工程学报, 2011, 30(2):400-410. Liu Qingbing, Xiang Wei, Lehane B M, et al. Experimental Study of Effect of Particle Shear Strength of Sand and Tip Resistance of Driven Piles[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(2):400-410. [7] Eide O, Hutchinson J N, Landava A. Short and Long Term Test Loading of a Friction Pile in Clay[C]//5th International Conference on Soil Mechanics and Foundation Engineering. Paris:[s.n.],1961:45-54. [8] Cooke R W, Price G, Tarr K. Jacked Piles in London Clay:A Study of Load Transfer and Settlement Under Working Condition[J]. Geotechnique, 1979, 29(2):113-147. [9] Bond A J, Jardine R J. Effects of Installing Displa-cement Piles in High OCR Clay[J]. Geotechnique, 1991, 41(3):341-363. [10] 张明义, 邓安福. 预制桩贯入层状地基的试验研究[J]. 岩土工程学报, 2000, 22(4):490-492. Zhang Mingyi, Deng Anfu. Experimental Study on Jacked Precast Piles in Layered Soil[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(4):490-492. [11] Pestana J M, Hunt C E, Bray J D. Soil Deformation and Excess Pore Pressure Field Around a Closed-Ended Pile[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2002, 128(1):1-12. [12] Gavin K G, Gallagher D G, Doherty P D, et al. Field Investigation Assessing the Effect of Installation Method on the Shaft Resistance of Piles in Clay[J]. Canadian Geotechnial Journal, 2010, 47(7):730-741. [13] Doherty P D, Gavin K G. Shaft Capacity of Open-Ended Piles in Clay[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2011, 137(11):1090-1102. [14] Kou H L, Zhang M Y, Yu F. Shear Zone Around Jacked Piles in Clay[J]. Journal of Performance of Constructed Facilities, 2015, 29(6):. [15] Einav I, Randolph M F. Combining Upper Bound and Strain Path Methods for Evaluating Penetration Resistance[J]. International Journal for Numerical Methods in Engineering, 2010, 63(14):1991-2016. [16] Martin C M, Randolph M F. Upper-Bound Analysis of Lateral Pile Capacity in Cohesive Soil[J]. Geotechnique, 2006, 56(2):141-146. |
[1] | 谭福林, 胡新丽, 张玉明, 何春灿, 章涵. 考虑渐进破坏过程的滑坡推力计算方法[J]. 吉林大学学报(地球科学版), 2018, 48(1): 193-202. |
[2] | 姚兆明,牛连僧,徐颖,王厚良,陈军浩. 恒定主应力轴偏转循环荷载下饱和软黏土累积孔压特性分析[J]. 吉林大学学报(地球科学版), 2013, 43(5): 1533-1538. |
[3] | 李雨浓, 李镜培, 赵仲芳, 朱火根. 层状地基静压桩贯入过程机理试验[J]. J4, 2010, 40(6): 1409-1414. |
[4] | 徐鹏举, 唐亮, 凌贤长, 高霞, 苏雷, 辛全明, 张勇强. 液化场地桩-土-桥梁结构地震相互作用简化分析方法[J]. J4, 2010, 40(5): 1121-1127. |
[5] | 吴旭君,范黎明,殷其雷. 新建城区大面积填土地基基础方案分析[J]. J4, 2008, 38(2): 290-0292. |
[6] | 冷曦晨,佴 磊,亓 宾. 桩基承载力模拟试验中相似性问题[J]. J4, 2005, 35(04): 491-0495. |
|