J4

• 水文·工程·环境 • Previous Articles     Next Articles

Feasibility Demonstration on Groundwater Reservoir in the Middle Reaches of Yinma River

DAI Chang-lei,CHI Bao-ming   

  1. College of Environment and Resources, Jilin University, Changchun 130026,China
  • Received:2005-04-09 Revised:1900-01-01 Online:2006-01-26 Published:2006-01-26
  • Contact: DAI Chang-lei

Abstract: The middle reaches of Yinma River,located 50 km east to Changchun in Jilin Province, is a potential place to build a pore groundwater reservoir,which will be an important strategic water resources field for Changchun City. Based on conditions of satisfying local water demand and no occurrence of environmental side effects, regulated water resources of 1.88×108m3/a can be obtained from saved discharge and induced recharge, but it will change largely over time. Maximal regulation volume is 8.21×108m3 and potential regulation volume is 4.98×108m3 for the objective aquifer composed of Quaternary sands and grits. In the case of artificial engineering for water exchange, groundwater reservoir in the middle reaches of Yinma River can supply water resources of 8 197.9×104m3/a theoretically.Just as a case study, this paper shows an overall idea about how to analyze and assess the feasibility of groundwater reservoir,from three aspects: sources,distribution, quality and quantity of regulated water; confined boundaries, structure and volume of regulating space; sites, ways and capacity of artificial exchanging engineering.

Key words: groundwater reservoir, regulated water, regulating space, water exchange conditions

CLC Number: 

  • P641.8
[1] Liu Changjun, Zhao Hua, Zhang Shunfu, Ding Liuqian. Finite Element Analysis on Unsteady Seepage Field of Groundwater Reservoir of Tailan River During the Pumping Water of the Radiation Well [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(3): 922-930.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!