J4 ›› 2013, Vol. 51 ›› Issue (01): 101-106.
Previous Articles Next Articles
WEI Xiaohui, FU Qingwu, LI Hongliang
Received:
Online:
Published:
Contact:
Abstract:
In order to solve the unreasonable wait existed in delay algorithm, this paper presents a method based on resource forecast delay scheduling algorithm, by which one reasonably dispatches operation on the basis of resource availability prediction method. The experimental results show that in the Hadoop cluster general application scenario, the scheduling algorithm, compared with related work, makes the average operating efficiency increased by a factor of 288% in the assurance of localization computing map task to be similar. This work will greatly improve the working efficiency of Mapreduce.
Key words: Hadoop platform, Mapreduce model, resource scheduling, resource forecast, delay scheduling
CLC Number:
WEI Xiao-Hui, FU Qiang-Wu, LI Hong-Liang. Resource Forecast Delay Algorithm for Hadoop Systems[J].J4, 2013, 51(01): 101-106.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://xuebao.jlu.edu.cn/lxb/EN/
http://xuebao.jlu.edu.cn/lxb/EN/Y2013/V51/I01/101
Cited