J4

• 地质工程·环境工程 • Previous Articles     Next Articles

Analysis of Foundation Scheme on Large-Scale Backfill Soil in the Proposed Urban Area

WU Xu-jun1,2,FAN Li-ming1,YIN Qi-lei1   

  1. 1.College of Construction Engineering,Jilin University,Changchun 130026,China;2.China Jingye Engineering Technology Ltd. Co.,Beijing 100088,China
  • Received:2007-11-29 Revised:1900-01-01 Online:2008-03-26 Published:2008-03-26
  • Contact: WU Xu-jun

Abstract: A new city zone will be built on a large area of backfill, and according to the complex engineering geology conditions, the CFG pile composite foundation scheme was finally selected. The isolated foundation and strip foundation were calculated and piles were designed after comprehensive analysis and comparison on economy, technique and construction period of various approaches like natural foundation and compound foundation etc. The CFG pile composite foundation is a kind of composite foundation that consists of CFG pile, soil among the piles and broken stone underlay. The CFG pile body is of good quality, short construction period, fast construction speed and big bearing capacity which can be more than 350 kPa. The CFG pile composite foundation should be adopted,if the maximum load of a pile is not more than 4 000 kN or there is a sand and gravel bed which is of high hydraulic permeability in the soil stratum.

Key words: backfill, composite foundation, CFG pile

CLC Number: 

  • TU473.1
[1] Li Qingfang, Wang Zhu, Yu Yang. Optimization of Area Replacement Ratio of Stone Column Based on Robustness Principle [J]. Journal of Jilin University(Earth Science Edition), 2022, 52(1): 171-.
[2] Wu Youping, Zhang Keneng, Liu Jie, He Jie. Settlement Characteristics of Composite Foundation Reinforced by Flexible Piles with Lateral Restraint [J]. Journal of Jilin University(Earth Science Edition), 2017, 47(3): 818-825.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] YU Ping, LI Rui-lei, FU Lei, HAO Xue, ZHANG Xiang-jun,LIAN Guo-fen. Regional Tectonic Characteristics and Significance of North Harbin Area in Songliao Basin: Evidenced from Long Seismic Profiles[J]. J4, 2005, 35(05): 611 -615 .
[2] ZHANG Yuan-qing, SONG Bing-zhong, WANG Yu-fu, ZHANG Ning. Metallogenetic Rules and Prediction of Gold Deposits Around Tongshi Complex,Western Shandong Province[J]. J4, 2010, 40(6): 1287 -1294 .
[3] LI Jian-ping, LI Tong-lin, ZHANG Hui, XU Kai-jun. Study and Application of the TEM Forward and Inversion Problem of Irregular Loop Source over the Layered Medium[J]. J4, 2005, 35(06): 790 -0795 .
[4] GAO Song,SONG Ying,WANG Lin,JIANG Buxin. Study on the Screening and Characterization of Special Effective Bacteria of Degrading Thiuram in the Waterbody[J]. J4, 2006, 36(03): 455 -457 .
[5] ZHANG Feng-jun, LI Qing, MA Jiu-tong, YU Guang-ju. Experimental Study on Treatment of Furfural Wastewater with Membrane Distillation[J]. J4, 2006, 36(02): 270 -0273 .
[6] LU Shuang-fang, LI Ji-jun, XUE Hai-tao, XU Li-heng. Chemical Kinetics of Carbon Isotope Fractionation of Oil-Cracking Methane and Its Initial Application[J]. J4, 2006, 36(05): 825 -829 .
[7] DING Zhi-hong,FENG Ping,MAO Hui-hui. Research and Application of a Method Considering Runoff Distribution Through A Year During Partitioning Runoff into Abundant and Low State[J]. J4, 2009, 39(2): 276 -0280 .
[8] REN He-jun, LIU Na, GAO Song,ZHANG Lan-ying,ZHANG Yu-ling,ZHOU Rui. Degradation of Polychlorinated Biphenyls and Confirm of bphA1 Gene Core by Pseudomonas DN2[J]. J4, 2009, 39(2): 312 -0316 .
[9] Huang Qibo, Qin Xiaoqun, Liu Pengyu, Kang Zhiqiang, Tang Pingping. Applicability of Karst Carbon Sinks Calculation Methods in Semi-Arid Climate Environment[J]. Journal of Jilin University(Earth Science Edition), 2015, 45(1): 240 -246 .
[10] Xiong Xiaoliang,Sun Hongyue,Zhang Shihua,Cai Yueliang. Analysis of Condition of Ensuring High-Lift Siphon Drainage and Numerical Simulation of Choice of Optimum Diameter[J]. Journal of Jilin University(Earth Science Edition), 2014, 44(5): 1595 -1601 .