Journal of Jilin University(Earth Science Edition) ›› 2018, Vol. 48 ›› Issue (5): 1596-1602.doi: 10.13278/j.cnki.jjuese.20180159
Previous Articles Next Articles
Yang Jihua1, Lu Xinjing1, Yan Changbin2, Qi Sanhong1, Guo Weixin1
CLC Number:
| [1] 张镜剑, 傅冰骏. 隧道掘进机在我国应用的进展[J]. 岩石力学与工程学报, 2007, 26(2):226-238. Zhang Jingjian, Fu Bingjun. Advances in Tunnel Boring Machine Application in China[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2):226-238. [2] 张镜剑. TBM的应用及其有关问题和展望[J]. 岩石力学与工程学报, 1999, 18(3):363-367. Zhang Jingjian. The Application and Some Problems of TBM and Its Prospects[J]. Chinese Journal of Rock Mechanics and Engineering, 1999, 18(3):363-367. [3] 尹俊涛, 尚彦军, 傅冰骏, 等. TBM掘进技术发展及有关工程地质问题分析和对策[J]. 工程地质学报, 2005, 13(3):389-397. Yin Juntao, Shang Yanjun, Fu Bingjun, et al. Development of TBM-Excavation Technology and Analyses & Countermeasures of Related Engineering Geological Problems[J]. Journal of Engineering Geology, 2005, 13(3):389-397. [4] 茅承觉. 我国全断面岩石掘进机(TBM)发展的回顾与思考[J]. 建设机械技术与管理, 2008, 21(5):81-84. Mao Chengjue. Review and Thoughts of Developmental Full Face Rock Tunnel Boring Machine(TBM) in China[J]. Construction Machinery Technology & Management, 2008, 21(5):81-84. [5] Bieniaski Z T. Classification of Rock Masses for Engineering[M]. New York:Wiley, 1993. [6] Barton N. Some New Q-Value Correlations to Assist in Site Characterization and Tunnel Design[J]. International Journal of Rock Mechanics & Mining Sciences, 2002, 39:185-216. [7] 工程岩体分级标准GB50218-2014[S]. 北京:中国计划出版社,2014. Standard for Classification of Engineering Rock Masses GB50218-94[S]. Beijing:China Planning Press, 1994. [8] 水利水电工程地质勘察规范GB50487-2008[S]. 北京:中国计划出版社,2009. Code for Geologic Investigation of Water Resources and Hydropower Engineering GB50487-2008[S]. Beijing:China Planning Press, 2009. [9] 黄祥志. 基于渣料和TBM掘进参数的围岩稳定性分类方法研究[D]. 武汉:武汉大学, 2005. Huang Xiangzhi. The Research of the Methods of Surrounding Rock Masses Stability Classification Based on the Geological Documentation of Muck and the Boring Parameters of TBM[D]. Wuhan:Wuhan University, 2005. [10] 黄扬一. 万安工程建基岩体回弹仪测试结果[J]. 大坝观测与土工测试, 1996, 20(3):39-42. Huang Yangyi. Schmidt Hammer in Foundation of Wan'an Dam[J]. Dam Observation and Geotechnical Tests, 1996, 20(3):39-42. [11] 尚彦军, 杨志法, 李丽慧, 等. 黑洞大型古地下洞室群工程地质条件及岩体稳定性分析[J]. 吉林大学学报(地球科学版), 2015, 45(1):214-224. Shang Yanjun, Yang Zhifa, Li Lihui, et al. Study of the Engineering Geological Conditions and Rock Mass Stability of Heidong Large Ancient Underground Caverns[J]. Journal of Jilin University(Earth Science Edition), 2015, 45(1):214-224. [12] 张鹏, 陈剑平, 张丽, 等. 隧道围岩断面轮廓分维数与岩体质量关系[J]. 吉林大学学报(地球科学版), 2010, 40(5):1110-1114. Zhang Peng, Chen Jianping, Zhang Li, et al. Relationship Between Fractal Dimension of Section Profile & Rock Quality of Tunnel Surrounding Rock Mass[J]. Journal of Jilin University(Earth Science Edition), 2010, 40(5):1110-1114. [13] 许传华, 任青文. 地下工程围岩稳定性的模糊综合评判法[J]. 岩石力学与工程学报, 2004, 23(11):1852-1855. Xu Chuanhua, Ren Qingwen. Fuzzy-Synthetical Evaluation on Stability of Surrounding Rockmassed of Underground Engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(11):1852-1855. [14] 盛继亮. 地下工程围岩稳定模糊综合评价模型研究[J]. 岩石力学与工程学报, 2003, 22(增刊1):2418-2421. Sheng Jiliang. Research on Fuzzy Synthetic Evaluation Model for the Stability of Surrounding Rocks of Underground Project[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(Sup.1):2418-2421. [15] 段瑜. 地下采空区灾害危险度的模糊综合评价[D]. 长沙:中南大学, 2005. Duan Yu. The Fuzzy-Synthetical Evaluation of Goaf Disaster Hazard Degree[D]. Changsha:Central South University, 2005. [16] 彭祖赠, 孙韫玉. 模糊数学及其应用[M]. 武汉:武汉大学出版社, 2002. Peng Zuzeng, Sun Yunyu. Fuzzy Mathematics and Its Application[M]. Wuhan:Wuhan University Press, 2005. [17] 卢有杰, 卢家仪. 项目风险管理[M]. 北京:清华大学出版社, 1998. Lu Youjie, Lu Jiayi. Project Risk Management[M]. Beijing:Tsinghua University Press, 1998. |
| [1] | Yang Zhongping, Zhao Kai, Gao Yuhao, Xiang Gonggu, Liu Xinrong. Mechanical Response of Tunnel Excavation in Deep Unconsolidated Soil-Rock Mixtures Backfill Based on Model Tests [J]. Journal of Jilin University(Earth Science Edition), 2025, 55(6): 1945-1957. |
| [2] | Yang Jihua, Guo Weixin, Cui Zhen, Wan Weifeng, Yao Yang. Comprehensive Deduction of In-Situ Stress Field Characteristics in Long and Deep Buried Tunnels of Yellow River to Xining Diversion Project [J]. Journal of Jilin University(Earth Science Edition), 2025, 55(2): 525-535. |
| [3] | Xu Chenghua, He Zhengyu, Liu Gang, Shi Wei, Luo Zujiang. Three-Dimensional Numerical Simulation of Ground Settlement Caused by Metro Shield Excavation in Jiangbei New District, Nanjing, China [J]. Journal of Jilin University(Earth Science Edition), 2024, 54(4): 1316-1325. |
| [4] | Zhang Xiaolin, Ying Li, Zhao Dong’an. Application of In-Situ Stress Measurement Technology of Ultra Deep Survey Borehole ASR Method#br# [J]. Journal of Jilin University(Earth Science Edition), 2024, 54(1): 198-207. |
| [5] | Ma Yinlong, Zhang Shiyu, Zhou Fujun, Sun Zhigang, Ren Jie. Impregnated Diamond Bit Optimal Design and Application in GanQing Tunnel [J]. Journal of Jilin University(Earth Science Edition), 2023, 53(6): 1845-1853. |
| [6] |
Ran Guangjiong, Yang Qiaochu, Wang Jian.
3D Geological Modeling Scheme for Super Long Tunnel Site [J]. Journal of Jilin University(Earth Science Edition), 2022, 52(3): 930-940. |
| [7] | Lu Dechun, Ma Yiding, Wang Guosheng. Numerical Study on Ground Surface Vibration Response Under Train Load in Multi Adjacent Tunnels [J]. Journal of Jilin University(Earth Science Edition), 2021, 51(5): 1452-1462. |
| [8] | Ou Xiaoqiang, Wang Shi, Li Yongliang, Liu Zhiqiang, Zheng Zongxi, Wu Jian. In-Situ Stress Analysis of Tunnel in Plate Suture Zone of Lhasa-Nyingchi Railway [J]. Journal of Jilin University(Earth Science Edition), 2019, 49(6): 1689-1697. |
| [9] | Shi Youzhi, Hua Jianbing, Li Xiufang, Lin Shuzhi. Application of Response Displacement Method in Seismic Design of Underground Utility Tunnels [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(6): 1785-1796. |
| [10] | Yu Qingyang, Liu Wei, Nie Lei, Dai Shulin. Characteristic Analysis on Stress Ratio of Unsymmetrical Load Tunnel [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(6): 1797-1803. |
| [11] | Lin Yi, Liu Zhengping, Wang Zhaoling, Xiao Di. Numerical Simulation of TSP Fault Model [J]. Journal of Jilin University(Earth Science Edition), 2015, 45(6): 1870-1878. |
| [12] | Wang Zhaoling, Liu Zhengping, Huang Yunyan, Huang Xianbin. Wavefield Modeling Based on the Finite Element Method for the Tunnel Seismic Prediction [J]. Journal of Jilin University(Earth Science Edition), 2014, 44(4): 1369-1381. |
| [13] | Wang Yu,Xu Qiang,Chai Hejun,Liu Li,Xia Yuchao,Wang Xiaodong. Rock Burst Prediction in Deep Shaft Based on RBF-AR Model [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(6): 1943-1949. |
| [14] | LIU Bin, LI Shu-cai, LI Shu-chen, NIE Li-chao, ZHONG Shi-hang, SONG Jie, LIU Zheng-yu. Forward Modeling and Application of Electrical Resistivity Method for Detecting Water-Bearing Structure in Tunnel [J]. J4, 2012, 42(1): 246-253. |
| [15] | WANG Wen-hua, WANG Qing, ZHAO Wen-ding. Shed Tunnel Structure Construction Technology in the Seasonal Frozen Region [J]. J4, 2011, 41(1): 168-171. |