青藏铁路建设环境的“三大难题”

许兆义1,李 宁2,魏 静1   

  1. 1.北京交通大学 土木建筑工程学院,北京 100044;2.铁道第一勘察设计院,西安 710043
  • 收稿日期:2006-10-20 修回日期:1900-01-01 出版日期:2007-03-26 发布日期:2007-03-26
  • 通讯作者: 许兆义

The Main Three Problems and Solutions for Qinghai-Tibet Railway Construction

XU Zhao-yi1, LI Ning2, Wei Jing1   

  1. 1. School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;2. First Railway Survey and Design Institute, Xi’an 710043,China
  • Received:2006-10-20 Revised:1900-01-01 Online:2007-03-26 Published:2007-03-26
  • Contact: XU Zhao-yi

摘要: 青藏铁路是世界上第一条跨越高原多年冻土区的铁路,工程建设环境面临多年冻土、高寒缺氧、生态脆弱的“三大难题”,比国内外其他多年冻土工程建设更艰巨和困难。由于青藏铁路建设环境的特殊性与复杂性,设计和建设中采取了多种保护冻土的有效措施、高原劳动卫生和劳动保护措施及生态环境保护措施及污染防治措施,各项措施在青藏铁路的建设和运营中显示出了良好的效果。

关键词: 青藏铁路, 多年冻土, 高寒缺氧, 环境保护

Abstract: Qinghai-Tibet railway, the first highland railway crossing permafrost region in the world, was confronted with main three mainly difficult problems, “permafrost, high-cold and oxygen deficit, and ecologic frangibility”. Its construction was more complicated and difficult than the other permafrost engineering at China and abroad. Due to the nature and complexity during Qinghai-Tibet railway construction, many effective measures were adopted in design and construction including various measures for permafrost protection, measures for labor health and labor protection on plateau, measures for ecological environment protection and preventing pollution, etc. These various measures showed approved effects during railway construction and operation.

Key words: Qinghai-Tibet railway, permafrost, high-cold and oxygen deficit, environment protection

中图分类号: 

  • X141
[1] 殷其雷,殷琨,柳鹤,甘心. 潜孔锤反循环钻进技术在某水电站的试验应用[J]. 吉林大学学报(地球科学版), 2014, 44(3): 961-968.
[2] 张虎, 张建明, 苏凯, 刘世伟. 高温-高含冰量冻土原位旁压蠕变试验[J]. 吉林大学学报(地球科学版), 2013, 43(6): 1950-1957.
[3] 张中琼, 吴青柏. 青藏高原多年冻土热融灾害发展预测[J]. J4, 2012, 42(2): 454-461.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!