Dynamic Response and Seismic Performance of High Filled Artificial Peninsula with Soil-Rock Mixtures on Deep Overburden Under Fortification Earthquakes

Huang Hua1,Wang Yuanyuan1,Pei Zhiyong1,Deng Xiaoqin1,Fang Huolang2   

  1. 1. PowerChina Huadong Engineering Corporation Limited, Hangzhou 311122, China

    2. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China

  • Online:2026-03-26 Published:2026-04-15
  • Supported by:

    Supported by the National Natural Science Foundation of China (51878605)

Abstract: In high seismic intensity reservoir areas, the seismic performance of high filled artificial peninsula with soil-rock mixtures on deep overburden is a key issue that needs to be considered in engineering design and construction. The seismic response of such structures is complex, not only affected by seismic waves, but also by the interaction between the overburden and the filling body. This paper takes the construction project of the Xiangbiling residential settlement in the Baihetan hydropower station reservoir area as the research background. Based on the geotechnical investigation results of the engineering site and structure design documents, a three-dimensional finite element refined model of the artificial peninsula-foundation-upper structure system is conducted using the finite element software MIDAS GTS/NX. According to field and laboratory test data, the physical and mechanical properties and constitutive model parameters of various geotechnical materials and filling materials are determined. Based on the seismic safety evaluation results of the site, the trigonometric series method is used to synthesize the artificial seismic waves with a 50 years exceedance probability of 10% for the engineering site. Through elastic-plastic dynamic time history analysis, the dynamic interaction mechanism, seismic response, and permanent deformation characteristics of the artificial peninsula-foundation-upper structure system are studied. The research results indicate that under the action of fortification earthquakes, the peak acceleration distributions along the transvers, longitudinal, and vertical directions at the central axis of the artificial peninsula generally shows a trend of first decreasing and then increasing with elevation, and their maximum acceleration amplification coefficients are 1.43, 1.81 and 1.67, respectively; The peak relative displacement along the transvers, longitudinal, and vertical directions at the central axes of the artificial peninsula reveals a non-linear increasing relationship with elevation, and the displacement in the transvers direction exhibits a clear whiplash effect; The maximum permanent deformation of the top platform along the transvers and longitudinal directions are 12.2 and 1.7 cm, respectively, which are much smaller than the limit given in the specifications; The maximum settlement of the top platform is 7.6 cm, and the corresponding seismic settlement rate is 0.25%, which is much smaller than the limit given in the specifications.

Key words: deep overburden, soil-rock mixture, high filled artificial peninsula, seismic response, permanent deformation

CLC Number: 

  • P315.9
[1] Yang Zhongping, Zhao Kai, Gao Yuhao, Xiang Gonggu, Liu Xinrong. Mechanical Response of Tunnel Excavation in Deep Unconsolidated Soil-Rock Mixtures Backfill Based on Model Tests [J]. Journal of Jilin University(Earth Science Edition), 2025, 55(6): 1945-1957.
[2] Zhang Tao, Guo Zhiqi, Liu Cai, Liu Xiwu, Liu Yuwei, . Seismic Responses Simulation of InterSalt Shale Oil Rhythm Formation and Prediction of Layer Thickness of Thin Shale Reservoirs [J]. Journal of Jilin University(Earth Science Edition), 2022, 52(1): 281-.
[3] Zhang Anqi, Su Lei, Ling Xianzhang, Tang Liang, Wang Jianfeng, Yan Zhen. Simplified Method for Seismic Analysis of Pile-Supported Wharf [J]. Journal of Jilin University(Earth Science Edition), 2021, 51(5): 1523-1534.
[4] Shi Youzhi, Hua Jianbing, Li Xiufang, Lin Shuzhi. Application of Response Displacement Method in Seismic Design of Underground Utility Tunnels [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(6): 1785-1796.
[5] Song Yang, Gu Hongbiao, Li Haijun, Chi Baoming. Comparison Analysis of Co-Seismic Response Characteristics of Groundwater Level at Two Sides of Fault: A Case Study of Dahuichang Observation Wells in the Middle of Babaoshan Fault in Beijing [J]. Journal of Jilin University(Earth Science Edition), 2016, 46(6): 1815-1822.
[6] Gao Wei, Hu Ruilin. Experimental Research on Strength Characteristics of Soil-Rock Mixture with Different Matrix Bonding [J]. Journal of Jilin University(Earth Science Edition), 2015, 45(4): 1164-1172.
[7] Yue Youxi, Huang Jianliang, Zhang Yang, Zhou Lei, Zhang Yuming,Chen Kongquan. Seismic Reservoir Prediction Technology Constrained by Geology Model and the Application in Lishu Fault Depression [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(2): 632-640.
[8] XUE Lin-fu, SUN Jing, BAI Ye, PAN Bao-zhi, WANG Jian-qiang. Method of Seismic-Log and Base Level Cycle Matching of Shahejie Formation, Kongnan Area in the Huanghua Depression [J]. J4, 2012, 42(4): 935-940.
[9] QIN Yue-shuang, CHEN You-fu, YE Ping. Seismic Prediction Reservoir by Tracking Thin and Narrow Sand [J]. J4, 2012, 42(1): 269-274.
[10] XU Peng-Ju, TANG Liang, LING Xian-zhang, GAO Xia, SU Lei, XIN Quan-ming, ZHANG Yong-qiang. Simplified Analysis Method for Seismic Pile-Soil-Bridge Structure Interaction in Liquefying Ground [J]. J4, 2010, 40(5): 1121-1127.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] CHENG Li-ren, ZHANG Yu-jie, ZHANG Yi-chun. Ordovician Nautiloid Fossils of Xainza Region,Tibet[J]. J4, 2005, 35(03): 273 -0282 .
[2] LI Bing-cheng. Preliminary Studies on Holocene Climatic In Fuping,Shaanxi Province[J]. J4, 2005, 35(03): 291 -0295 .
[3] HE Zhong-hua,YANG De-ming,WANG Tian-wu,ZHENG Chang-qing. SHRIMP U[CD*2]Pb Dating of Zircons from Two-Mica Granite in Baga Area in Gangdise Belt[J]. J4, 2005, 35(03): 302 -0307 .
[4] CHEN Li, NIE Lei, WANG Xiu-fan, LI Jin. Seismic Risk Analysis of Some Electric Power Equipment Station in Suizhong[J]. J4, 2005, 35(05): 641 -645 .
[5] JI Hong-jin,SUN Feng-yue2,CHEN Man,HU Da-qian,SHI Yan-xiang,PAN Xiang-qing. Geochemical Evaluation for Uncovered GoldBearing Structures in Jiaodong Area[J]. J4, 2005, 35(03): 308 -0312 .
[6] CHU Feng-you, SUN Guo-sheng,LI Xiao-min,MA Wei-lin, ZHAO Hong-qiao. The Growth Habit and Controlling Factors of the CobaltRich Crusts in Seamount of the Central Pacific[J]. J4, 2005, 35(03): 320 -0325 .
[7] LI Bin, MENG Zi-fang, LI Xiang-bo, LU Hong-xuan, ZHENG Min. The Structural Features and Depositional Systems of the Early Tertiary in the Biyang Depression[J]. J4, 2005, 35(03): 332 -0339 .
[8] LI Tao, WU Sheng-jun, CAI Shu-ming, XUE Huai-ping, YASUNORI Nakayama. Simulation Analysis of the Storage Capacity Based on DEM Before and After Connecting to Yangtze River in Zhangdu Lake[J]. J4, 2005, 35(03): 351 -0355 .
[9] KUANG Li-xiong,GUO Jian-hua, MEI Lian-fu, TONG Xiao-lan, YANG Li. Study on the Upheaval of the Bogeda Mountain Block from Angle of Oil and Gas Exploration[J]. J4, 2005, 35(03): 346 -0350 .
[10] ZHANG Guang-xin, DENG Wei, HE Yan, RAMSIS Salama. An Application of Hydrological Response Units in Assessment of Soil Salinization Risks[J]. J4, 2005, 35(03): 356 -0360 .