J4
• 地球物理·勘查技术 • Previous Articles
GAO Ke1,SUN Rong-jun2,SUN You-hong1
Received:
Revised:
Online:
Published:
Contact:
Abstract: To resolve the puzzle of collapse and buried comes forth owing to scouring the wall of hole in construction of drillng long hole for sucking and exhaling mash gas. Adopt the technic of foam increasing pressure to solve the problem by advancing the pressure of foam current. The application of technic of foam increasing pressure in construction of drillng long hole for sucking and exhaling mash gas is feasible and economical.
Key words: foam drilling, increasing pressure equipment, mash gas, hole of sucking and exhaling
CLC Number:
GAO Ke,SUN Rong-jun,SUN You-hong. Prospect of Application of Foam Pump Increasing Pressure Equipment in Construction of Drilling Long Hole for Sucking and Exhaling Mash Gas[J].J4, 2005, 35(04): 543-0544.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://xuebao.jlu.edu.cn/dxb/EN/
http://xuebao.jlu.edu.cn/dxb/EN/Y2005/V35/I04/543
Cited