Journal of Jilin University(Earth Science Edition) ›› 2021, Vol. 51 ›› Issue (4): 1160-1171.doi: 10.13278/j.cnki.jjuese.20200015

Previous Articles     Next Articles

Dynamic Real-Time Flood Risk Analysis and Management System

Liu Yongzhi1,2, Zhang Wenting3, Cui Xinmin1, Meng Bobo4, Niu Shuai1, Liang Dawei4   

  1. 1. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing 210029, China;
    2. Nanjing Hydraulic Research Institute, Nanjing 210029, China;
    3. College of Hydrology and Water Resources, Hohai University, Nanjing 210098, China;
    4. Jiangsu Century Information Technology Co., Ltd., Nanjing 210012, China
  • Received:2020-03-02 Online:2021-07-26 Published:2021-08-02
  • Supported by:
    Supported by the National Key R & D Program of China (2019YFC1510204), the Grants for Visiting Scholars of China Scholarship Council (201908320132), the National Science Foundation of China (41471427), the Central Public-Interest Scientific Institution Basal Research Fund (Y521002、Y517018) and the Science Research Business Expenses in Central Universities (2019B10714)

Abstract: Current flood risk analysis is mainly based on typical design standard floods, which cannot meet the needs of actual flood control management. In order to improve the real-time flood risk analysis and adapt to the dynamics of flooding, in this study, a dynamic real-time flood risk analysis framework was designed. In this framework, one-dimensional and two-dimensional dynamic coupled hydrodynamic numerical methods were used to couple the dyke breach model, and then a flooding simulation model was established in Qiaosang flood protection area. Through improvement, the flood inundation conditions can be simulated and analyzed based on real-time water conditions or arbitrary design floods. By flexibly set the boundary conditions and dynamically set the breach function, the flooding process of the protected area after single breach or combined breach was calculated. According to this framework, the dynamic real-time flood risk map compilation and management application system of the Qiaosang flood protection area was developed, and further verified by using the historical flood data. The verification results show that the absolute errors of the highest water level measured at Makou Station, Sanshui Station, Da'ao Station, and Ganzhu (1) Station during the 2008-06 flood and the highest water level calculated by the model are -0.10 m, 0.10 m, 0.09 m, and 0.04 m, respectively, which meet the requirements of the precision of flood simulation. The model was used to calculate the flood discharge and the water level inside and outside the breach of Jianggen dike when the flood occurs once every 200-year in Xijiang River, when the simulated width of the breach was 168 m, the maximum flow of the breach reached 5 190 m3. The village inundation caused by the flood of 3 h, 6 h and 24 h after the dyke breach was analyzed, and the results satisfy the rationality analysis.

Key words: dynamic flood risk map, real-time flood risk, hydrodynamic model, dike breach flood

CLC Number: 

  • TV122
[1] 李航, 于德万, 刘心玲. 松花江洪水风险图编制及管理应用[J]. 东北水利水电, 2016, 4(3):43-44. Li Hang, Yu Dewan, Liu Xinling. Compilation and Management Application of Songhua River Flood Risk Map[J]. Water Resources & Hydropower of Northeast China, 2016, 4(3):43-44.
[2] 张文婷, 唐雯雯. 基于水动力学模型的沿海城市洪水实时演进模拟[J]. 吉林大学学报(地球科学版), 2021, 51(1):212-221. Zhang Wenting, Tang Wenwen. Real-Time Flood Routing Simulation of Coastal Cities Based on Hydrodynamic Model[J]. Journal of Jilin University(Earth Science Edition), 2021, 51(1):212-221.
[3] Mount J, Alabbad Y, Demir I. Towards an Integrated and Realtime Wayfinding Framework for Flood Events[C]//the 2nd ACM SIGSPATIAL International Workshop.[L.n.]:ACM, 2019:33-36. https://dl.acm.org/doi/10.1145/3356395.3365543.
[4] 罗秋实.黄河下游洪水淹没风险实时动态仿真关键技术[J].人民黄河,2018,40(9):2. Luo Qiushi. Key Technologies for Real-Time Dynamic Simulation of Flood Inundation Risk in the Lower Yellow River[J]. Yellow River, 2018, 40(9):2.
[5] 寇嘉玮,董增川,罗赟,等.基于WebGIS的洪泽湖地区动态洪涝管理信息系统[J].长江科学院院报,2019,36(1):145-150. Kou Jiawei, Dong Zengchuan, Luo Yun, et al. Management Information System of Dynamic Flood in Hongze Lake Area Based on WebGIS[J]. Journal of Yangtze River Scientific Research Institute, 2019, 36(1):145-150.
[6] 牛帅,崔信民.村镇易涝区动态洪水风险分析模型研究[J].中国农村水利水电,2019(4):80-83. Niu Shuai, Cui Xinmin. Dynamic Flood Risk Analysis Model for Waterlogged Areas in Villages and Towns[J]. China Rural Water and Hydropower, 2019(4):80-83.
[7] 张小稳,刘国庆,范子武.动态洪水风险图在无锡市城区防洪中的应用研究[J].水资源开发与管理,2019(5):10-17. Zhang Xiaowen, Liu Guoqing, Fan Ziwu. Application Research of Dynamic Flood Risk Map in Flood Control of Wuxi City[J]. Water Resources Development and Management, 2019(5):10-17.
[8] 郭磊,舒全英,刘攀,等.鳌江流域洪水风险动态预警预报研究[J].中国农村水利水电,2019(6):35-38,43. Guo Lei, Shu Quanying, Liu Pan, et al. Research on the Flood Dynamic Warning and Forecasting in Aojiang River Basin[J]. China Rural Water and Hydropower, 2019(6):35-38,43.
[9] 顾锦, 刘秀林, 曹丹,等. 衢州市城市洪水风险信息管理系统初探[J]. 浙江水利科技, 2016, 44(3):16-19. Gu Jin, Liu Xiulin, Cao Dan, et al. Preliminary Study on Urban Flood Risk Information Management System in Quzhou City[J]. Zhejiang Hydrotechnics, 2016, 44(3):16-19.
[10] 梁忠民, 王军, 施晔,等. 基于GIS的洪水风险图信息管理系统开发[J]. 水文, 2009, 29(6):65-68. Liang Zhongmin, Wang Jun, Shi Ye, et al. Developmen of Flood Risk Map Information Management System Based on GIS[J]. Hydrology, 2009, 29(6):65-68.
[11] 陈文龙, 宋利祥, 邢领航,等. 一维-二维耦合的防洪保护区洪水演进数学模型[J]. 水科学进展, 2014, 25(6):848-855. Chen Wenlong, Song Lixiang, Xing Linghang, et al. A 1D-2D Coupled Mathematical Model for Numerical Simulating of Flood Routine in Flood Protected Zone[J]. Advances in Water Science, 2014, 25(6):848-855.
[12] 张防修, 韩龙喜, 王明,等. 主槽一维和滩地二维侧向耦合洪水演进模型[J]. 水科学进展, 2014, 25(4):560-566. Zhang Fangxiu, Han Longxi, Wang Ming, et al. Flood Routing Model with Lateral Coupling One-Dimensional Channel and Two-Dimensional Floodplain Simulation[J]. Advances in Water Science, 2014, 25(4):560-566.
[13] 朱婷, 王鑫. 基于MIKE FLOOD模型的中顺大围洪水风险研究[J]. 中国水运,2016(7):71-74. Zhu Ting, Wang Xin. Research on Flood Risk of Zhongshun Dawei Based on MIKE FLOOD Model[J]. China Water Transport, 2016(7):71-74.
[14] 李传奇, 侯贵兵. 一维二维水动力模型耦合的城市洪水模拟[J]. 水利水电技术, 2010, 41(3):83-85. Li Chuanqi, Hou Guibing. Simulation on Urban Flood Based on Coupling of 1D and 2D Hydrodynamic Models[J]. Water Resources and Hydropower Engineering, 2010, 41(3):83-85.
[15] 尹宏伟. 基于水动力数学模型评估孝义市护城河行洪排涝能力[J]. 水资源开发与管理,2018, 32(9):29-34. Yin Hongwei. Assessment of Flood Discharge Capacity of the Moat in Xiaoyi Based on Hydrodynamic Mathematical Model[J]. Water Resources Development and Management, 2018, 32(9):29-34.
[16] 李芮, 潘兴瑶, 邸苏闯,等. 北京城区典型内涝积水原因诊断研究:以上清桥区域为例[J].自然资源学报, 2018,33(11):1940-1952. Li Rui, Pan Xingyao, Di Suchuang, et al. Diagnostic Analysis of the Waterlogging Influence Factors in Beijing City:A Case Study of Shangqingqiao Catchment[J]. Journal of Natural Resources, 2018, 33(11):1940-1952.
[17] 张涛,单既连,亓立云,等.考虑漫溢过程的一维堤防溃决分洪计算研究[J].人民黄河,2018,40(6):53-56. Zhang Tao, Shan Jilian, Qi Liyun, et al. Research on One-Dimensional Calculation of Levee Breach and Flood Diversion Simulation with the Consideration of Overflow Process[J]. Yellow River, 2018, 40(6):53-56.
[18] 王小笑,雷声,傅群. 基于GIS反演技术的鄱阳湖蓄滞洪区洪水风险图绘制研究[J]. 中国农村水利水电, 2014(5):170-172. Wang Xiaoxiao, Lei Sheng, Fu Qun. Research on Flood Risk Map of Poyang Lake's Flood Storage and Detention Areas Based on Inversion Technology of GIS[J]. China Rural Water and Hydropower, 2014(5):170-172.
[19] 冯涛,马振坤,谢忱, 等.英德市北江干堤防洪工程对飞来峡水利枢纽防洪调度影响[J].水利水运工程学报,2016(2):69-75. Feng Tao, Ma Zhenkun, Xie Chen, et al. Impacts of Yingde Beijiang Stem Dike Flood Control Works on Flood Control Operation for Feilaixia Hydroproject[J]. Hydro-Science and Engineering, 2016(2):69-75.
[20] 张强. 基于Web Services的洪水风险图信息管理系统设计与实现[D]. 大连:大连理工大学, 2013. Zhang Qiang. Design and Implementation of the Flood Risk Maps Information Management System Based on Web Services[D]. Dalian:Dalian University of Technology, 2013.
[1] Zhang Wenting, Tang Wenwen. Real-Time Flood Routing Simulation of Coastal Cities Based on Hydrodynamic Model [J]. Journal of Jilin University(Earth Science Edition), 2021, 51(1): 212-221.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] CHENG Li-ren, ZHANG Yu-jie, ZHANG Yi-chun. Ordovician Nautiloid Fossils of Xainza Region,Tibet[J]. J4, 2005, 35(03): 273 -0282 .
[2] CHEN Li, NIE Lei, WANG Xiu-fan, LI Jin. Seismic Risk Analysis of Some Electric Power Equipment Station in Suizhong[J]. J4, 2005, 35(05): 641 -645 .
[3] LI Bin, MENG Zi-fang, LI Xiang-bo, LU Hong-xuan, ZHENG Min. The Structural Features and Depositional Systems of the Early Tertiary in the Biyang Depression[J]. J4, 2005, 35(03): 332 -0339 .
[4] ZHAO Hong-guang,SUN Jing-gui, CHEN Jun-qiang,ZHAO Jun-kang, YAO Feng-liang,DUAN Zhan. The Genesis and Evolution of Orebearing Fluids of the Xiaoxinancha Goldbearing Porphyry Copper Deposit in Yanbian Area: H,O,C,S,Pb Isotope Tracing[J]. J4, 2005, 35(05): 601 -606 .
[5] MENG Yuan-lin,GAO Jian-jun,LIU De-lai, NIU Jia-yu,SUN Hong-bin,ZHOU Yue,XIAO Li-hua,WANG Yue-chuan. Diagenetic Facies Analysis and Anomalously High Porosity Zone Prediction of the Yuanyanggou Area in the Liaohe Depression[J]. J4, 2006, 36(02): 227 -0233 .
[6] ZENG Zhao-fa, WU Yan-gang, HAO Li-bo,WANG Zhe-jiang,HUANG Hang. The Poisson’s Theorem Based Analysis Method and Application of Magnetic and Gravity Anomalies[J]. J4, 2006, 36(02): 279 -0283 .
[7] CHANG Qiu-ling, LU Xin-xiang, LIU Dong-hua, LI Ming-li. The Relation Between Gold Deposits and Wuduoshan Granite in Eastern Qinling[J]. J4, 2006, 36(03): 319 -325 .
[8] MA Yan-mei,CUI Qi-liang,ZHOU Qiang,HUANG Wei-jun,LIU Ye,PENG Gang,ZOU Guang-tian. InSitu Raman Study of Olivine Under High Temperature[J]. J4, 2006, 36(03): 342 -345 .
[9] HAO Qi,LIU Zhen, ZHA Ming, LI Chun-xia. Characters and Controlling Factors on the Archean Fracturetype Reservoirs of the Ciyutuo Buried Hill in the Liaohe Basin[J]. J4, 2006, 36(03): 384 -390 .
[10] ZENG Dao-ming, JI Hong-jin, CHEN Man,HU Da-qian, ZHU Yong-zheng. The Relationships between Geological and Geochemical Variables at Shancheng Gold Deposit in Jiaodong Area[J]. J4, 2006, 36(04): 511 -515 .