Journal of Jilin University(Earth Science Edition) ›› 2024, Vol. 54 ›› Issue (4): 1305-1315.doi: 10.13278/j.cnki.jjuese.20220333

Previous Articles     Next Articles

IR-90 Full Hydraulic Iron Roughneck Clamping Positioning Accuracy and Its Influencing Factors

Li Haoxuan 1, Wang Qingyan 1, 2, Zhong Weiling 1, Sheng Jie 1, Li Linghao 1, Jin Zengwu 1   

  1. 1. College of Construction Engineering, Jilin University, Changchun 130026, China
    2. Key Laboratory of Complicated Conditions Drilling Technology (Jilin University), Ministry of Land and Resources, Changchun 130026, China
  • Received:2022-12-07 Online:2024-07-26 Published:2024-07-26
  • Supported by:
    the National Deep Exploration Technology and Experimental Research Project (SinoProbe-09-05)

Abstract: Iron roughneck is advanced drilling auxiliary operation equipment, and domestic iron roughnecks have many shortcomings in automation degree, clamping positioning accuracy and work smoothness. In order to solve the problem,a new type of iron roughneck structure and its hydraulic control system are designed in this paper. Firstly, through the machine-hydraulic co-simulation analysis, the axis deviation angle and radial force change of the drill pipes during the makeup and breakout process of the iron roughneck were studied. Then, the control system of the iron roughneck is optimized on this basis, and the synchronous motor and PID (proportional integral differential) control are used to further analyze the influence of increasing hydraulic cylinders input flow rate on the synchronous performance of the hydraulic cylinders, clamping positioning accuracy and radial force of the joint thread of the fixed plier and moving plier. The results show that PID control has better clamping effect than synchronous motor. When the input flow rate of a single hydraulic cylinder is 18 L/min, the x and y axial deviation angles of the drill pipe can be controlled within 0.10°and 0.06°when clamped with fixed plier, and the response speed is about 6.8 seconds. The distance between the center of gravity of the upper and lower drill pipes along the x and y axis directions can be respectively controlled within 1.93 and 2.85 mm, which ensures the clamping positioning accuracy, rapidity and stability of the fixed plier and the moving plier. The radial force curve of the joint thread also indicates that the unbalanced radial force between the drill pipe joints during the iron roughnecks punching (17.2 kN) is much greater than that of the spinning (641.0 N), which is more likely to cause the drill bit to wear.

Key words: iron roughneck, positioning accuracy, machine-hydraulic co-simulation analysis, unbalanced radial force;drilling

CLC Number: 

  • P634.9
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LU Jin-cai, LI Yu-hong, WEI Xian-yang, WEI Jian-she. Research on the Depositional Environment and Resources Potential of the Oil Shale in the Chang7 Member,Triassic Yanchang Formation in the Ordos Basin[J]. J4, 2006, 36(6): 928 -0932 .
[2] ZHAO Yu-yan, HAO Li-bo, ZHANG Zhi-li,LU Ji-long, SUN Guang-rui. Design and Realization of Metal Deposit Exploration Information System[J]. J4, 2008, 38(1): 161 -0166 .
[3] WANG Yu, XU Qiang, CHAI He-jun, TANG Sheng-chuan, FENG Wu-yi. Evaluation of Displacement Time Series in Landslide Prone Stratum Based on Shannon False Neighbors Model[J]. J4, 2011, 41(1): 177 -181 .
[4] SUN Cai-zhi, LIU Yu-lan, YANG Jun. Research on the Ecological and Sustainable Groundwater Table Regulation in the Lower Liaohe River Plain[J]. J4, 2007, 37(2): 249 -254 .
[5] LAN Kai, XIONG You-ming, YAN Guang-qiang, LIU Ming-guo, LIU Kuang-xiao. Horizontal Borehole Stability and Its Influence on Well Completion Optimization in the Northeast Sichuan Basin[J]. J4, 2011, 41(4): 1233 -1238 .
[6] LIU Guo-xin, HAN Kai, HAN Jiang-tao. Lithosphere Electrical Structure in Southeast Coastal Region,South China[J]. J4, 2012, 42(2): 536 -544 .
[7] Ma Guoqing,Du Xiaojuan,Li Lili,Li Wencheng,Wang Fenggang. Gradient Deconvolution Method and Its Application in Mineral Exploration[J]. Journal of Jilin University(Earth Science Edition), 2013, 43(1): 259 -266 .
[8] Jiang Xue, Liang Xiujuan, Xiao Changlai, Yan Baizhong. Three-Dimensional Seepage Analysis of Tailings Damming Period[J]. Journal of Jilin University(Earth Science Edition), 2014, 44(2): 619 -625 .
[9] Zhu Ziqiang, Peng Lingxing, Lu Guangyin, Mi Shiwen. Improved Borehole-GPR Tomography Based on Cross-Correlation[J]. Journal of Jilin University(Earth Science Edition), 2014, 44(2): 668 -674 .
[10] Fu Changliang, Sun Deyou, Wei Hongyan, Gou Jun. Geochemistry and Magma Source Characteristics of the Cretaceous Granites from Xiaoxinancha in Hunchun, Jilin[J]. Journal of Jilin University(Earth Science Edition), 2015, 45(5): 1436 -1446 .