J4

• 水文·工程·环境 • Previous Articles     Next Articles

Three-Dimensional Numerical Simulation of Groundwater in Naolihe Watershed

LU Wen-xi1,LI Ping1,WANG Fu-lin2,GUO Long-zhu3   

  1. 1. College of Environment and Resources, Jilin University, Changchun 130026, China;2. Engineering College, Northeast Agricultural University, Harbin 150030, China;3. State Key Laboratory of HydrologyWater Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, China
  • Received:2006-07-13 Revised:1900-01-01 Online:2007-05-26 Published:2007-05-26
  • Contact: LU Wen-xi

Abstract: Based on analyzing and conceptualizing the geologic and hydrogeologic conditions of Naolihe watershed, the numerical simulation model of groundwater flow system has been built and solved by Visual MODFLOW, and groundwater flow regime in future 7 years has also been predicted. In the process of model prediction, second-type boundary was forecasted with iterative method, annual precipitation and groundwater withdrawal was forecasted by spectral analysis, which well realized the coupling of stochastic model and deterministic model. The results show that the average annual recharge of groundwater in the research area is 20.9×108 m3/a. From predicted head equipotentials, it can be seen that groundwater level in the research area will declinef during prediction periods with the avarage speed of 0.329m/a if mining according to the forecasted withdrawal.

Key words: Naolihe watershed, threedimensional numerical modeling, Visual MODFLOW

CLC Number: 

  • P641.2
[1] Huang Xing, Lu Ying, Liu Xiao, Duan XiaoFei, Zhu Limin. Impact of Groundwater Level Rising on Suspended Solids Clogging During Artificial Recharge [J]. Journal of Jilin University(Earth Science Edition), 2017, 47(6): 1810-1818.
[2] Liu Guoqing, Wu Shiqiang, Fan Ziwu, Zhou Zhifang, Xie Chen, Wu Jingxiu, Liu Yang. Analytical Derivation on Recharge and Periodic Backwashing Process and the Variation of Recharge Pressure [J]. Journal of Jilin University(Earth Science Edition), 2016, 46(6): 1799-1807.
[3] Yu Peng, Ma Teng, Tang Zhonghua, Zhou Wei. Feasibility of Oilfield Wastewater Disposal in the Underpressure System of Basin [J]. Journal of Jilin University(Earth Science Edition), 2016, 46(1): 211-219.
[4] Huang Xiudong, Shu Longcang, Cui Junling,Tong Kun,Zhou Qingpeng. Test on the Characteristic of Physical Clogging During Groundwater Artificial Recharge and Derivation of Percolation Empirical Formula [J]. Journal of Jilin University(Earth Science Edition), 2014, 44(6): 1966-1972.
[5] Chen Rongbo,Shu Longcang,Lu Chengpeng,Li Wei. Experimental Study on the Characteristic Parameters Variation of the Aquifer Caused by Aquifer Compaction [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(6): 1958-1965.
[6] He Yujiang, Lin Wenjing, Wang Guiling. In-Situ Monitoring on the Soil Water-Heat Movement of Deep Vadose Zone by TDR100 System [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(6): 1972-1979.
[7] Liu Changjun, Zhao Hua, Zhang Shunfu, Ding Liuqian. Finite Element Analysis on Unsteady Seepage Field of Groundwater Reservoir of Tailan River During the Pumping Water of the Radiation Well [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(3): 922-930.
[8] Jiang Si-min, Wang Pei, Shi Xiao-qing,Zheng Mao-hui. Groundwater Contaminant Source Identification by Hybrid Hooke-Jeeves and Attractive Repulsive Particle Swarm Optimization Method [J]. Journal of Jilin University(Earth Science Edition), 2012, 42(6): 1866-1872.
[9] SU Xiao-si, GU Xiao-xi, MENG Jing-ying, ZHANG Wen-jing, WANG Han-mei, JIAO Xun. Fate and Transptort Simulation of Multi-Component Solute Under Artificial Recharge Conditions [J]. J4, 2012, 42(2): 485-491.
[10] WANG Zi-jia, DU Xin-qiang, YE Xue-yan, SONG Xiao-ming, ZHANG Jia-shuang, GAO Cui-ping. Suspended Solid Surface Clogging During Urban Stormwater Groundwater Recharge [J]. J4, 2012, 42(2): 492-498.
[11] ZHAI Yuan-zheng, WANG Jin-sheng, HUAN Huan, TENG Yan-guo. Groundwater Dynamic Equilibrium Evidence for Changes of Renewability of Groundwater in Beijing Plain [J]. J4, 2012, 42(1): 198-205.
[12] LU Ying, DU Xin-qiang, CHI Bao-ming, YANG Yue-suo, LI Sheng-tao, WANG Zi-jia. The Porous Media Clogging Due to Suspended Solid During the Artificial Recharge of Groundwater [J]. J4, 2011, 41(2): 448-454.
[13] HU Ji-hua,ZHANG Yan-jun,YU Zi-wang,WU Gang,YANG Xiao-ying,NI Fu-quan. Groundwater Flow Transfixion of Groundwater Source Heat Pump System and Its Influence on Temperature Field [J]. J4, 2008, 38(6): 992-0998.
[14] YE Dong-cheng, MU Shan, TAO Yue-zan. Stream-Water Quality Modelling with Influence of Groundwater Recharge [J]. J4, 2008, 38(4): 644-0648.
[15] LIU Pei-gui, SHU Long-cang. Uncertainty on Numerical Simulation of Groundwater Flow in the Riverside Well Field [J]. J4, 2008, 38(4): 639-0643.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!