吉林大学学报(工学版) ›› 2004, Vol. ›› Issue (3): 502-506.
Previous Articles Next Articles
ZANG Xuebai1, GUAN Xin2, ZHAO Kun1, TANG Mi1
CLC Number:
[1] FOSTER I, KESSELMAN C, TUECKE S. The anatomy of the grid:enabling scalable virtual organizations[J].International J Supercomputer Applications, 2001,15(3):200-222. [2] FOSTER Ian,KESSELMAN C,NICK J,TUECKE S. The physiology of the grid:an open grid service architecture for distributed systems integration[Z]. January,2002. [3] CZAJKOWKI K, FOSTER I, KESSELMAN C, KARONIS N, MARTIN S, SMITH W, TUECKE S. A resource management architecture for metacomputing systems[C]//Proc IPPS/SPDP'98 Workshop on Job Scheduling Strategies for Parallel Processing. Springer-Verlag LNCS1459,1998:62-82. [4] SEKIGUCHI S Sato, NINF M. Network based information library for globally high performance computing[C]//In Proceedings of the Parallel Object-Oriented Methods and Applications (POOMA), 1996:39-48. [5] FREUND R, GHERRITY M. Scheduling resources in multi-user, heterogeneous computing environments with Smarnet[C]//Proceedings of the 7th Heterogeneous Computing Workshop (HCW' 98). IEEE Computer Society Press, 1998. [6] KLAUS Krauter, RAJKUMAR Buyya, MUTHCMARU Maheswaran. A taxonomy and survey of grid resource management system[J]. Softw Pract Exper,2002,32(2):135-164. |
[1] | NI Ying-sheng,SUN Qi-xin,MA Ye,XU Dong,LIU Chao. Shear distribution of multi-cell corrugated steel web composite beams based on space grid analysis [J]. Journal of Jilin University(Engineering and Technology Edition), 2018, 48(6): 1735-1746. |
[2] | XIE Zhi-qiang, GUO He, SU Wen-xiu, XIN Yu, YANG Jing. Reversal sequence integrated scheduling algorithm of multiple workshop with multi-procedures ended together [J]. 吉林大学学报(工学版), 2018, 48(2): 578-587. |
[3] | LAN Feng-chong, HUANG Jia-nan, CHEN Ji-qing, LI Li-fen. Numerical simulation and experiment on thermal load of vehicle seats under natural exposure [J]. 吉林大学学报(工学版), 2018, 48(1): 65-73. |
[4] | MA Ye, NI Ying-sheng, XU Dong, DIAO Bo. External prestressed strengthening based on analysis of spatial grid model [J]. 吉林大学学报(工学版), 2018, 48(1): 137-147. |
[5] | NI Ying-sheng, SUN Qi-xin, MA Ye, XU Dong. Calculation of capacity reinforcement about composite box girder with corrugated steel webs based on tensile stress region theory [J]. 吉林大学学报(工学版), 2018, 48(1): 148-158. |
[6] | WANG Feng-yan, HUANG Run-qiu, CHEN Jian-ping, ZHANG Yuan-yuan, WANG Ming-chang. Camera calibration based on computer vision and surveying adjustment fundamentals [J]. 吉林大学学报(工学版), 2017, 47(3): 944-951. |
[7] | DONG Yue-li, GUO Quan, SUN Bin, KANG Ling. Dynamic task migration optimization for molecule docking [J]. 吉林大学学报(工学版), 2015, 45(4): 1253-1259. |
[8] | YANG Yan-lin, JING Jing, YANG Zhi-jie, XU Tian-fu, WANG Fu-gang. Grid subdivision technology for multiphase flow simulation with complex geological condition [J]. 吉林大学学报(工学版), 2015, 45(4): 1281-1287. |
[9] | WANG Jing-yu, WANG Ze-wei, GU Qing-tong, HU Xing-jun, WANG Bao-yu. Numerical simulation of transient aerodynamic characteristics of turning vehicle [J]. 吉林大学学报(工学版), 2015, 45(1): 44-48. |
[10] | ZHANG Qing-feng,XU Jing,LI Shan-shan. Interaction-aware parallel query scheduling strategy [J]. 吉林大学学报(工学版), 2015, 45(1): 252-260. |
[11] | WU Jun-wei, ZHU Yun-long, KU Tao, WANG Liang. Hot routes detection algorithm based on grid clustering [J]. 吉林大学学报(工学版), 2015, 45(1): 274-282. |
[12] | KANG Bing, WANG Xi-hui, LIU Fu. Path planning of searching robot based on improved ant colony algorithm [J]. 吉林大学学报(工学版), 2014, 44(4): 1062-1068. |
[13] | LIU Shu-fen, MENG Dong-xue, WANG Xiao-yan. DBSCAN algorithm based on grid cell [J]. 吉林大学学报(工学版), 2014, 44(4): 1135-1139. |
[14] | GUO Dong-liang, NIE Jun-lan, WANG Yan-fen, KONG Ling-fu. Parameterization method for multi-scale regular grid model repairing cracks [J]. 吉林大学学报(工学版), 2014, 44(01): 211-218. |
[15] | LIU Tong, LI Hai-fu, REN Li-ye, ZANG Mu-jun. Application of system identification for rehabilitation equipment-driven based on GS-SVM [J]. 吉林大学学报(工学版), 2013, 43(增刊1): 199-203. |
|