Journal of Jilin University(Earth Science Edition) ›› 2023, Vol. 53 ›› Issue (6): 1845-1853.doi: 10.13278/j.cnki.jjuese.20230292

Previous Articles     Next Articles

Impregnated Diamond Bit Optimal Design and Application in GanQing Tunnel

Ma Yinlong1,Zhang Shiyu1,Zhou Fujun2,Sun Zhigang1,Ren Jie1   

  1. 1. College of Construction Engineering, Jilin University, Changchun 130026,China
    2. China Railway First Survey & Design Institute Group Co., Ltd., Xi’an 710043, China
  • Online:2023-11-26 Published:2023-12-13
  • Supported by:
     the National Key Research and Development Program of China (2021YFC2900200) and the Key Research and Development Program of Jilin Province (20230203114SF)

Abstract: The impregnated diamond bit is a micro-cutting edge formed by exposing diamond in the matrix, and realizes the drilling of broken rock by crushing and grinding the rocks under the action of drilling pressure and torque. It can be widely used in hard formation and complex formation drilling. However, conventional diamond drill bits have problems such as low drilling speed, slow footage and high costs in hard formations. Firstly, rock samples, which were sampled in different depths form holes adjacent to the borehole S2Z-45 in GanQing  tunnel, were taken for testing and analysis of their hardness, mineral composition, and drillability. It was determined that most of rock layers were mainly diorite, and the rock’s drillability level was eight. Then, according to the geological characteristics of Ganqing tunnel, the matrix hardness and bottom lip shape of impregnated diamond were optimized. The influencing factors of the performance of impregnated diamond bit was analyzed by field tests. The experimental results showed that the impregnated diamond bit had the best performance when its matrix hardness was HRC 15-20, a diamond particle size was 40-50 mesh, the volume fraction of diamond was 20%, and a bottom lip with a ring groove sharp tooth shape. It has a lifespan of 321 m and a drilling speed of approximately 1.17 m/h. Under the same diamond parameters, the hob type impregnated diamond bit with a matrix hardness of HRC 10-15 had advantages in drilling speed, which the drilling speed of the drill bit could reach 1.44 m/h. The sharp tooth bottom lip surface of the ring groove and high matrix hardness helped to improve the life of the drill bit, while the rolling tooth bottom lip surface and low matrix hardness were beneficial for improving drilling efficiency, but the life of the drill bit was relatively low.

Key words: GanQing , tunnel, impregnated diamond drill bit, ring groove sharp tooth type, hobbing type, drill bit matrix

CLC Number: 

  • P634.41
[1] Zhang Xiaolin, Ying Li, Zhao Dong’an. Application of In-Situ Stress Measurement Technology of  Ultra Deep Survey Borehole ASR Method#br# [J]. Journal of Jilin University(Earth Science Edition), 2024, 54(1): 198-207.
[2] Ran Guangjiong, Yang Qiaochu, Wang Jian.

3D Geological Modeling Scheme for Super Long Tunnel Site [J]. Journal of Jilin University(Earth Science Edition), 2022, 52(3): 930-940.

[3] Lu Dechun, Ma Yiding, Wang Guosheng. Numerical Study on Ground Surface Vibration Response Under Train Load in Multi Adjacent Tunnels [J]. Journal of Jilin University(Earth Science Edition), 2021, 51(5): 1452-1462.
[4] Ou Xiaoqiang, Wang Shi, Li Yongliang, Liu Zhiqiang, Zheng Zongxi, Wu Jian. In-Situ Stress Analysis of Tunnel in Plate Suture Zone of Lhasa-Nyingchi Railway [J]. Journal of Jilin University(Earth Science Edition), 2019, 49(6): 1689-1697.
[5] Yu Qingyang, Liu Wei, Nie Lei, Dai Shulin. Characteristic Analysis on Stress Ratio of Unsymmetrical Load Tunnel [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(6): 1797-1803.
[6] Shi Youzhi, Hua Jianbing, Li Xiufang, Lin Shuzhi. Application of Response Displacement Method in Seismic Design of Underground Utility Tunnels [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(6): 1785-1796.
[7] Yang Jihua, Lu Xinjing, Yan Changbin, Qi Sanhong, Guo Weixin. Stability Classification of Tunnel Surrounding Rock During Shield TBM Construction Based on Fuzzy Comprehensive Evaluation [J]. Journal of Jilin University(Earth Science Edition), 2018, 48(5): 1596-1602.
[8] Lin Yi, Liu Zhengping, Wang Zhaoling, Xiao Di. Numerical Simulation of TSP Fault Model [J]. Journal of Jilin University(Earth Science Edition), 2015, 45(6): 1870-1878.
[9] Wang Zhaoling, Liu Zhengping, Huang Yunyan, Huang Xianbin. Wavefield Modeling Based on the Finite Element Method for the Tunnel Seismic Prediction [J]. Journal of Jilin University(Earth Science Edition), 2014, 44(4): 1369-1381.
[10] Wang Yu,Xu Qiang,Chai Hejun,Liu Li,Xia Yuchao,Wang Xiaodong. Rock Burst Prediction in Deep Shaft Based on RBF-AR Model [J]. Journal of Jilin University(Earth Science Edition), 2013, 43(6): 1943-1949.
[11] LIU Bin, LI Shu-cai, LI Shu-chen, NIE Li-chao, ZHONG Shi-hang, SONG Jie, LIU Zheng-yu. Forward Modeling and Application of Electrical Resistivity Method for Detecting Water-Bearing Structure in Tunnel [J]. J4, 2012, 42(1): 246-253.
[12] WANG Wen-hua, WANG Qing, ZHAO Wen-ding. Shed Tunnel Structure Construction Technology in the Seasonal Frozen Region [J]. J4, 2011, 41(1): 168-171.
[13] ZHENG Bai-gong, ER Lei, HONG Qian, LIU Wei. Study and Development on Appraisal Software for Surrounding Rock Mass Stability of Highway Tunnel [J]. J4, 2010, 40(5): 1133-1139.
[14] ZHANG Peng, CHEN Jian-ping, ZHANG Li, XIAO Yun-hua. Relationship Between Fractal Dimension of Section Profile &|Rock Quality of Tunnel Surrounding Rock Mass [J]. J4, 2010, 40(5): 1110-1114.
[15] XIAO Yun-hua, CHEN Jian-ping, ZHANG Peng, ZHANG Li. Fractal Feature of Overbreak-Underbreak Figure of Tunnel Section [J]. J4, 2010, 40(1): 153-158.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] JIANG Xue, CHENG Ri-hui, YU Min-feng. Climate and Tectonic Controls on the Rift Stratigraphy:Analysis of Zscape Model and its Application in the BeianFaulting Depression of the Songliao Basin[J]. J4, 2006, 36(01): 54 -0059 .
[2] HE Jun-ling, DENG Shou-wei, CHEN Wen-long, JIA Yu-kun,Gao Jin-qi. Evaluation of Oil Shale in the Southern Songliao Basin Using Logging Techniques[J]. J4, 2006, 36(6): 909 -0914 .
[3] WANG Qing-hua, SUN You-hong, CHEN Chang-fu, WU Xiao-han. BTR-4000] In-Situ Testing Equipment of Strata Thermophysical Properties and Its Application[J]. J4, 2009, 39(2): 347 -0352 .
[4] MA Jian-qing, LI Qing-chun. TT Transform Method of Surface Wave Suppression[J]. J4, 2011, 41(2): 565 -571 .
[5] JIANG Li-guo, LIANG Bing. A Coupled Model of Hydro-Transport-Thermal in Variable Saturated Porous Media Considering Geochemical Process[J]. J4, 2011, 41(5): 1529 -1534 .
[6] Yu Xiao-fei,Hou Zeng-qian,Zhang Han,Qian Ye,Li Bi-le. Characteristics of Ore-Forming Fluids and Metallogenic Mechanism of the Daheishan Porphyry Mo Deposit in Yongji Area, Jilin Province[J]. Journal of Jilin University(Earth Science Edition), 2012, 42(6): 1688 -1699 .
[7] ZHANG Chun-yan, ZHANG Xing-zhou, QIU Dian-ming. Zircon U-Pb Isotopic Ages of Amphibolite of Qinglongcun Group in Yanbian Area and Its Geological Significance[J]. J4, 2007, 37(4): 672 -0677 .
[8] LIU Yong-jiang, Franz Neubauer, LI Wei-min, Johann Genser, LI Wei. Tectono-Thermal Events of the Northern Qaidam Margin-Southern Qilian Area, Western China[J]. J4, 2012, 42(5): 1317 -1329 .
[9] Jia Zhenzhen, Lin Chengyan, Ren Lihua, Dong Chunmei, Gong Bao. Diagenesis and Reservoir Quality Evolution of Low Permeability Tuffaceous Sandstones in Suderte Oilfield[J]. Journal of Jilin University(Earth Science Edition), 2016, 46(6): 1624 -1636 .
[10] HU Da-qian, CHU Feng-you, YAO Jie. The Mineral Composition and Element Geochimestry of CoEnriched Crust from the YJA Sea Mount in the Central Pacific Ocean[J]. J4, 2006, 36(01): 32 -0037 .