吉林大学学报(工学版) ›› 2015, Vol. 45 ›› Issue (1): 252-260.doi: 10.13229/j.cnki.jdxbgxb201501037
• Orignal Article • Previous Articles Next Articles
ZHANG Qing-feng,XU Jing,LI Shan-shan
CLC Number:
[1] Ahmad M, Aboulnaga A, Babu S. Query interactions in database workloads[C]∥Processings of the Workshop on Testing Database Systems, Providence,Rhode Island,USA,2009. [2] 曹阳,方强,王国仁,等.基于遗传算法的多连接表达式并行查询优化[J].软件学报, 2002, 13(2):250-257. Cao Yang, Fang Qiang, Wang Guo-ren, et al. Parallel query optimization techniques for multi-join expressions based on genetic algorithm[J]. Journal of Software, 2002, 13(2): 250-257. [3] 张丽,杨树强,李爱平,等. 海量数据管理平台MDMP中并行加载与查询技术研究[J].计算机研究与发展, 2007,44(Suppl.): 475-480. Zhang Li, Yang Shu-qiang, Li Ai-ping, et al. Parallel data loading and query techniques in massive data management platform[J].Journal of Computer Research and Development, 2007, 44(Suppl.): 475-480. [4] Chi Y, Moon H J, Hacigumus H. iCBS: incremental cost based scheduling under piecewise linear slas[J]. Proceedings of the VLDB Endowment, 2011, 4(9):563-574. [5] Bianca Schroeder, Mor Harchol-Balter, Arun Iyengar, et al. How to determine a good multi-programming level for external scheduling[C]∥Proceedings of ICDE, 2006. [6] Ahmad M, Aboulnaga A, Babu S, et al. Modeling and exploiting query interactions in database systems[C]∥Proceedings of CIKM, 2008: 183-192. [7] Ahmad M, Duan S, Aboulnaga A, et al. Interaction -aware prediction of business intelligence workload completion times[C]∥Proceedings of ICDE, 2010: 413-416. [8] Tozer S, Brecht T, Aboulnaga A. Q-cop: avoiding bad query mixes to minimize client timeouts under heavy loads[C]∥Proceedings of ICDE, 2010:397-408. [9] Duggan J, Cetintemel U, Papaemmanouil O, et al. Performance prediction for concurrent database workloads[C]∥In SIGMOD Conference, 2011: 337-348. [10] 张延松,张宇,黄伟,等.分布式聚集函数支持的内存OLAP并行查询处理技术[J].软件学报, 2009, 20(Suppl.): 165-175. Zhang Yan-song, Zhang Yu, Huang Wei, et al. Distributed aggregate functions enabled parallel main-memory OLAP query processing technique[J].Journal of Software, 2009, 20(Suppl.): 165-175. [11] 闫莺,金澈清,曹锋,等. 多数据流上共享窗口连接查询的降载策略[J].计算机研究与发展, 2004, 41(10): 1836-1841. Yan Ying, Jin Che-qing, Cao Feng, et al. Load shedding for shared window joins over data streams[J]. Journal of Computer Research and Development, 2004, 41(10):1836-1841. [12] TPC-H benchmark specification[DB/OL]. http://www.tpc.org/tpch [13] Ganapathi A, Kuno H, Dayal U, et al. Predicting multiple metrics for queries: Better decisions enabled by machine learning[C]∥In Proceedings of ICDE, 2009: 592-603. [14] Babu S, Borisov N, Duan S, et al. Automated experiment-driven management of (database) systems[C]∥Proceedings of the Workshop on Hot Topics in Operating Systems, 2009. [15] WEKA workbench[DB/OL]. http://www.cs.waikato.ac.nz/ ml/weka/. [16] Sheikh M B, Minhas U F, Khan O Z, et al. A bayesian approach to online performance modeling for database appliances using gaussian models[C]∥International Conference on Autonomic Computing, 2011:121-130. |
[1] | XIE Zhi-qiang, GUO He, SU Wen-xiu, XIN Yu, YANG Jing. Reversal sequence integrated scheduling algorithm of multiple workshop with multi-procedures ended together [J]. 吉林大学学报(工学版), 2018, 48(2): 578-587. |
[2] | DONG Yue-li, GUO Quan, SUN Bin, KANG Ling. Dynamic task migration optimization for molecule docking [J]. 吉林大学学报(工学版), 2015, 45(4): 1253-1259. |
[3] | REN Xiang-long, GAO De-yuan, FAN Xiao-ya, AN Jian-feng. Analysis of delay bounds for NoC based on improved asymmetric multi-channel router [J]. 吉林大学学报(工学版), 2014, 44(3): 782-787. |
[4] | GUO Zhen-hua, WU Yan-xia, ZHANG Guo-yin, YANG Jie, GU Guo-chang. Basic block-level pointer analysis algorithm for C2VHDL compiler [J]. 吉林大学学报(工学版), 2013, 43(02): 417-423. |
[5] | LIU Yan-heng, ZHOU Peng, WANG Jian, DENG Jun-yi. Context-aware adaptive middleware in vehicular network [J]. 吉林大学学报(工学版), 2013, 43(02): 410-416. |
[6] | HAN Li-min, GAO De-yuan, FAN Xiao-ya, SHI Li-wen, AN Jian-feng. Reusable data predicting mechanism for shared last level Cache in chip multi-processor [J]. , 2012, (06): 1505-1509. |
[7] | ZANG Xuebai, GUAN Xin, ZHAO Kun, TANG Mi. New scheduling strategy of grid task [J]. 吉林大学学报(工学版), 2004, (3): 502-506. |
|