吉林大学学报(理学版) ›› 2026, Vol. 64 ›› Issue (3): 675-0683.

• • 上一篇    下一篇

 大型池式钠冷快堆紧急停堆瞬态主系统集成仿真

马远航1, 张东辉2, 叶尚尚1, 刘一哲1, 王晓坤1, 张瑞鹏3   

  1. 1. 中国原子能科学研究院, 北京 102413; 2. 中核霞浦核电有限公司, 福建 宁德  355199; 3. 北京诺思维信科技有限公司, 北京 100085
  • 收稿日期:2024-12-10 出版日期:2026-05-26 发布日期:2026-05-26
  • 通讯作者: 马远航 E-mail:331675723@qq.com

Integrated Simulation of Transient Main System for Emergency Shutdown of Large Pool-Type Sodium-Cooled Fast Reactor

MA Yuanhang1, ZHANG Donghui2, YE Shangshang1, LIU Yizhe1, WANG Xiaokun1, ZHANG Ruipeng3   

  1. 1. China Institute of Atomic Energy, Beijing 102413, China;2. CNNP Xiapu Nuclear Power Co., Ltd., Ningde 355199, Fujian Province, China;3. Beijing Neoswise Technology Co., Ltd., Beijing 100085, China
  • Received:2024-12-10 Online:2026-05-26 Published:2026-05-26

摘要: 基于国内仿真支撑平台vPower, 建立大型钠冷快堆堆芯系统、 一回路、 二回路、 三回路及主要仪控系统仿真模型, 对大型池式钠冷快堆紧急停堆工况下主系统动态响应特性进行仿真分析, 并将仿真计算结果与实堆试验数据进行对比验证. 结果表明, 在满功率稳态工况下, 仿真计算结果与实堆运行数据偏差小于1%, 紧急停堆瞬态下仿真计算结果与实堆数据符合较好, 主要变量变化趋势基本一致, 可准确反映反应堆主系统的动态特性.

关键词: 池式钠冷快堆, 紧急停堆, 全厂协调控制, 仿真计算

Abstract: Based on the domestic simulation support platform vPower, we established a simulation model of the core system, primary circuit, secondary circuit, tertiary circuit and main instrumentation and control system of large sodium-cooled fast reactor. We simulated and analyzed the dynamic response characteristics of the main system under the emergency shutdown condition of a large pool-type sodium-cooled fast reactor, and compared and verified the simulation calculation results with the real reactor test data. The results show that the deviation between the simulation calculation results and the real reactor operation data under the full power steady-state condition is less than 1%, the simulation calculation results fit well with the real reactor data under the emergency shutdown transient state, and the change trend of the main variables is basically consistent, which can accurately reflect the dynamic characteristics of the main reactor system.

Key words: pool-type sodium-cooled fast reactor, emergency shutdown, coordinated control of whole plant, simulation calculation

中图分类号: 

  • O411.3