吉林大学学报(工学版) ›› 2021, Vol. 51 ›› Issue (6): 2061-2067.doi: 10.13229/j.cnki.jdxbgxb20200606
• 交通运输工程·土木工程 • 上一篇
Yu-ling JIAO1(),Lin LI1,Jin LI1(),Bin-jie XU2,Nan CAO1
摘要:
在假设条件下建立单U型装配线第一类平衡规划模型,根据表达产品作业优先关系的邻接矩阵特征,确定入口和出口候选作业集合,依据综合阶位值大小依次选择分配作业,求解单U型装配线平衡问题。结合小算例,详细说明了改进启发式算法的求解过程并编程计算,运用改进启发式算法程序计算了32个经典算例,将计算结果和评价指标分别与启发式算法和遗传算法进行对比,验证了该改进启发式算法有效,且计算速度快、计算结果稳定。
中图分类号:
1 | Miltenburg G J, Wijngaard J. The U-line line balancing problem[J]. Management Science, 1994, 40(10):1378-1388. |
2 | Li Z X, Kucukkoc I, Tang Q H. New MILP model and station-oriented ant colony optimization algorithm for balancing U-type assembly lines[J]. Computers & Industrial Engineering, 2017, 112:107-121. |
3 | Li Z X, Kucukkoc I, Zhang Z K. Branch, bound and remember algorithm for U-shaped assembly line balancing problem[J]. Computers & Industrial Engineering, 2018, 124:24-35. |
4 | Babazadeh H, Alavidoost M H, Zarandi M H F, et al. An enhanced NSGA-II algorithm for fuzzy bi-objective assembly line balancing problems[J]. Computers & Industrial Engineering, 2018, 123:189-208. |
5 | Fathi M, Alvarez M J, Rodriuez V. A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing[J]. European Journal of Industrial Engineering, 2016, 10(2):145-169. |
6 | Aydogan E K, Delice Y, Ozcan U, et al. Balancing stochastic U-lines using particle swarm optimization[J]. Journal of Intelligent Manufacturing, 2019, 30(1):97-111. |
7 | 郑巧仙,何国良,李明,等. 第2类U型装配线平衡问题的双阶段蚁群算法[J]. 计算机科学, 2017, 44(6):206-211, 225. |
Zheng Qiao-xian, He Guo-liang, Li Ming, et al. Two stage ant colony optimization for type-2 of U-shaped assembly line balncing problem[J]. Computer Science, 2017, 44(6):206-211, 225. | |
8 | 童艺川,吴锋. U型装配线的启发式平衡方法[J]. 南京理工大学学报, 2000, 24(5):394-397. |
Tong Yi-chuan, Wu Feng. Heuristic balancing method for U-shaped assembly line[J]. Journal of Nanjing University of Science and Technology, 2000, 24(5):394-397. | |
9 | Küçükkoç I, Zhang D Z. Balancing of parallel U-shaped assembly lines[J]. Computers & Operations Research, 2015,64:233-244. |
10 | Li M, Tang Q H, Zheng Q X, et al. Rules-based heuristic approach for the U-shaped assembly line balancing problem[J]. Applied Mathematical Modeling, 2017, 48:423-439. |
11 | 焦玉玲,邢小翠,朱春凤,等. 简单直线和U型装配线平衡中的改进阶位法[J]. 同济大学学报:自然科学版, 2019, 47(1):143-148. |
Jiao Yu-ling, Xing Xiao-cui, Zhu Chun-feng, et al. Modified ranked positional weight technique for assembly line balancing of simple line and U-shape[J]. Journal of Tongji University(Natural Science), 2019, 47(1):143-148. | |
12 | 焦玉玲,李名鹃,王占中,等. 一种随机双U型装配线优先权值平衡方法[J]. 吉林大学学报:工学版, 2020, 50(6):2087-2093. |
Jiao Yu-ling, Li Ming-juan, Wang Zhan-zhong, et al. A random double U-shaped assembly line balancing method using priority value[J]. Journal of Jilin University(Engineering and Technology Edition), 2020, 50(6):2087-2093. |
[1] | 杨聚芬,姜桂艳,马明辉. 基于因子定理的路网交通运行可靠性在线分析[J]. 吉林大学学报(工学版), 2015, 45(1): 68-74. |
[2] | 吕锋, 杨印生, 郭长青. 基于改进模糊物元模型的设备重要度评价新方法[J]. 吉林大学学报(工学版), 2014, 44(01): 111-116. |
|