吉林大学学报(工学版) ›› 2014, Vol. 44 ›› Issue (3): 686-691.doi: 10.13229/j.cnki.jdxbgxb201403017
• Orignal Article • Previous Articles Next Articles
YANG Zhao-jun,WANG Ji-li,LI Guo-fa,ZHANG Xin-ge
CLC Number:
[1] Dey S, Sarmah P. Estimation of parameters of a model of a complex repairable system[J]. Microelectronics Reliability, 1995, 37(4):673-676. [2] 杨明顺,林志航,何炳蔚,等. 基于产品间相似的机械产品可靠性预测[J].机床与液压,2003(1):63-65. Yang Ming-shun, Lin Zhi-hang, He Bing-wei, et al. Reliability prediction of mechanical product based on similarity[J].Machine Tool & Hydraulics, 2003(1):63-65. [3] Gaver D P. Time to failure and availability of paralleled system with repair[J]. IEEE Transactions on Reliability, 1963, R-12(2):30-38. [4] Cox D R. The analysis of non-Markovian stochastic processes by the inclution of supplementary variables[J]. Cambridge Phil, 1955, 51(3):433-441. [5] Wang Shi-long, Li Shi-long, Zhou Jie, et al. Reliability allocation for CNC machine based on improved fuzzy analytic hierarchy process[J].Advances in Information Sciences and Service Sciences, 2012,4(1):320-327. [6] 彭宝华,赵建印,孙权.复杂系统可靠性分配的层次分析法[J].电子产品可靠性与环境试验,2005,23(6):58-62. Peng Bao-hua,Zhao Jian-yin,Sun Quan.Reliability allocation method for complex system using AHP[J].Electronic Product Reliability and Environmental Testing,2005,23(6):58-62. [7] 杨兆军,郝庆波,陈菲,等.基于区间分析的冲压机床可靠性模糊综合分配方法[J].北京工业大学学报,2011,37(3):321-329. Yang Zhao-jun, Hao Qing-bo, Chen Fei, et al. A comprehensive fuzzy reliability allocation method of NC machine tools based on interval analysis[J].Journal of Beijing University of Technology,2011, 37(3): 321-329. [8] Asri Y M, Azrulhisham E A, Dzuraidah A W, et al. Fatigue life reliability prediction of a stub axle using Monte Carlo simulation[J].International Journal of Automotive Technology, 2011, 12(5):713-719. [9] Naess A,Leira B J,Batsevych O. System reliability analysis by enhanced Monte Carlo simulation[J].Structural Safety, 2009, 31(5):349-355. [10] Zhang Hai-bo, Jia Ya-zhou, Zhou Guang-wen. Time between failures model and failure analysis of CNC system[J]. Journal of Harbin Institute of Technology, 2007, 14(2):197-201. [11] 申桂香,陈炳锟,张英芝,等. 数控机床小样本类型子系统的可靠性建模[J].重庆大学学报,2011,34(8): 55-59. Shen Gui-xiang, Chen Bing-kun, Zhang Ying-zhi, et al. Reliability model for subsystems of CNC machine tool with small samples[J]. Journal of Chongqing University, 2011, 34(8):55-59. |
[1] | ZHENG Yu-bin, YANG Bin, WANG Xiao-feng, SHEN Gui-xiang, ZHAO Xian-zhuo, QIN Meng-meng. Test time design of motorized spindle accelerated life test based on Weibull distribution [J]. 吉林大学学报(工学版), 2018, 48(3): 767-772. |
[2] | WANG Fang-rong, GUO Bai-cang, JIN Li-sheng, GAO Lin-lin, YUE Xin-yu. Selection of safe evaluation indexes and weight calculation for secondary task driving [J]. 吉林大学学报(工学版), 2017, 47(6): 1710-1715. |
[3] | SI Wei, MA Biao, REN Jun-ping, WANG Hai-nian, GE-Sang Ze-ren. Analysis of asphalt pavement performance under freeze-thaw cycles using reliability method [J]. 吉林大学学报(工学版), 2016, 46(1): 126-132. |
[4] | WANG Yan-zhong, HOU Liang-wei, LYU Qing-jun, ZHAO Xing-fu, WU Can-hui. Processing technology of face gear complex surface based on bus control [J]. 吉林大学学报(工学版), 2015, 45(6): 1836-1843. |
[5] | on improved EM algorithm. Reliability modeling of finite Weibull distribution based [J]. 吉林大学学报(工学版), 2014, 44(4): 1010-1015. |
[6] | SHEN Gui-xiang, MENG Shu, ZHANG Ying-zhi, QI Xiao-yan, LUAN Lan, SONG Qi. Application of average rank time method in reliability modeling for subsystems [J]. 吉林大学学报(工学版), 2014, 44(01): 101-105. |
[7] | GU Dong-wei, SHEN Gui-xiang, ZHANG Ying-zhi, WANG Zhi-qiong, DING Ye, LIANG Dong. Reliability analysis of spindle system base on location-scale model [J]. 吉林大学学报(工学版), 2012, 42(增刊1): 104-107. |
[8] | LIU Ke-Ge, YAN Chu-Liang. Probability distribution of fatigue test data and fatigue life of aircraft structure [J]. 吉林大学学报(工学版), 2011, 41(02): 419-0423. |
[9] | TAN Yi-Qiu, XU Hui-Ning, A.I. AIHadidy, LI Xiao-Min. Distribution of volumetric parameters in asphalt mixture [J]. 吉林大学学报(工学版), 2011, 41(02): 360-0365. |
[10] | MENG Guang-Wei, CA Bin, LI Feng, DONG Xin. New method for structural reliability analysis by combining curve fitting with Monte Carlo simulation [J]. 吉林大学学报(工学版), 2010, 40(增刊): 293-0296. |
[11] | LI Ming-Tao, ZHENG Jian-Hua, YU Ti-Zheng, GAO Dong. Strategy for impulsive station keeping of libration point missions [J]. 吉林大学学报(工学版), 2009, 39(05): 1407-1412. |
[12] | LI Zhe, DING Zhen-Liang, YUAN Feng. Optical measurement of aircraft attitude parameters and accuracy Monte Carlo simulation [J]. 吉林大学学报(工学版), 2009, 39(05): 1401-1406. |
[13] |
YAO Rong-han, WANG Dian-hai, LI Li-li .
Revised Weibull revision model of headway distribution for motorvehicle [J]. 吉林大学学报(工学版), 2009, 39(02): 331-0335. |
[14] |
ZHANG Ying-zhi,SHEN Gui-xiang,WU Su,XUE Yu-xia,He Yu .
3-parameter Weibull distribution for random truncated NC machine tool fault data [J]. 吉林大学学报(工学版), 2009, 39(02): 378-0381. |
[15] | Meng Fan-zhong;Cheng Ya-bing;Li Ya-nan . Fatigue lifetime distribution pattern of automotive chain [J]. 吉林大学学报(工学版), 2006, 36(06): 889-0892. |
|